小程序
投稿
VIP
登录 / 注册

Fabregat & Fabregat

Since our beginning, we have worked to achieve a rigorous architecture in its project and constructive dimension, which is related to the nowadays society and with a wide connection with the user. Because of that we have focused our work on new technologies and standardization, in order to improve the design control, from concept until construction. Following these premises, we have adapted our design process and construction management to the BIM method (Building Information Modeling), keeping the team always up to date. Using this system, we have obtained a better design control and permanent coordination between the different work teams. All of these have been possible due to the shared collaborative 3D model usage.

没有找到相关获奖案例
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号